Problem 32.31 Easy Free 4 variations

Combined Work Rates

A kiddie pool is being filled by two hoses while its drain is open. The first hose alone would fill the empty pool in 2020 minutes, the second hose alone in 1010 minutes, and the drain alone would empty a full pool in 1515 minutes. With both hoses running and the drain open, how many minutes does it take to fill the pool from empty?

Work it out, then compare with the answer.

SolutionShow the worked solution

Measure work in pools and time in minutes, so each device has a rate in pools per minute. The two hoses add water at rates 120\frac{1}{20} and 110\frac{1}{10}. The drain removes water at rate 115\frac{1}{15}.

Everything runs at once, so the rates add, with the drain counted negatively:

120+110−115=3+6−460=560=112.\frac{1}{20}+\frac{1}{10}-\frac{1}{15}=\frac{3+6-4}{60}=\frac{5}{60}=\frac{1}{12}.

The net rate is positive, so the pool does fill. One full pool at 112\frac{1}{12} pool per minute takes

12 minutes\boxed{12 \text{ minutes}}

Key idea. Times do not add, but rates do. Convert each worker to a rate, add the rates, then invert the total.

Variations

The same idea with a twist. Each solution gives only the changed step.

Variation 32.31a

Two gardeners mow a lawn. Working alone, the first finishes in 11 hour and the second in 11 hour 1515 minutes. Working together at their respective constant rates, how many minutes do they need to mow the lawn once?

Work it out, then compare with the answer.

Solution

Work in minutes. The first gardener mows 160\frac{1}{60} of the lawn per minute and the second 175\frac{1}{75}. Together they mow

160+175=5+4300=3100\frac{1}{60}+\frac{1}{75}=\frac{5+4}{300}=\frac{3}{100}

of the lawn per minute. Hence they need

1003≈33.3 minutes\boxed{\tfrac{100}{3}\approx 33.3 \text{ minutes}}
Variation 32.31b

Alice and Bob can each finish building a pipe alone in 120120 minutes and 100100 minutes respectively. They start building together, and after 4040 minutes Charlie joins them, working at his own constant rate. The three of them finish the pipe together 1010 minutes after Charlie joins. How many minutes would Charlie need to build the pipe alone?

Work it out, then compare with the answer.

Solution

Together Alice and Bob build 1120+1100=11600\frac{1}{120}+\frac{1}{100}=\frac{11}{600} of the pipe per minute. In 4040 minutes they complete 440600\frac{440}{600}, which leaves 160600\frac{160}{600}.

The three finish this remainder in 1010 minutes, so their combined rate is 16600\frac{16}{600}. Charlie’s rate is therefore 16−11600=1120\frac{16-11}{600}=\frac{1}{120}. Alone, he would need

120 minutes\boxed{120 \text{ minutes}}
Variation 32.31c

A farmer’s cow and goat together would eat all the grass in a field in 4545 days; the cow and the goose together would eat it in 6060 days; and the goat and the goose together would eat it in 9090 days. Each animal grazes at its own constant rate. If the cow, the goat and the goose grazed the field together, how many days would it take them to eat all the grass?

Work it out, then compare with the answer.

Solution

Let a,b,ca,b,c be the rates of the cow, goat and goose, in fields per day. The three pairs give

a+b=145,a+c=160,b+c=190.a+b=\frac{1}{45},\qquad a+c=\frac{1}{60},\qquad b+c=\frac{1}{90}.

Adding the three equations counts each animal twice:

2(a+b+c)=4+3+2180=120.2(a+b+c)=\frac{4+3+2}{180}=\frac{1}{20}.

So a+b+c=140a+b+c=\frac{1}{40}.

The individual rates are a=5360a=\frac{5}{360}, b=1120b=\frac{1}{120} and c=1360c=\frac{1}{360}. All are positive, so the data are consistent. Grazing together, the three animals need

40 days\boxed{40 \text{ days}}
Variation 32.31d

A farming company must till 1111 identical plots of land. Four farmers, each working at the same constant rate, start the job and together till 22 plots in 55 hours. The company wants to hire additional farmers, each working at that same rate, so that the remaining 99 plots are tilled within the next 1212 hours. What is the minimum number of additional farmers needed?

Work it out, then compare with the answer.

Solution

Four farmers working 55 hours supply 2020 farmer-hours and till 22 plots. So one farmer tills 110\frac{1}{10} plot per hour.

With nn additional farmers, 4+n4+n farmers working 1212 hours till 12(4+n)10\frac{12(4+n)}{10} plots. This must be at least 99:

12(4+n)10≥9  ⟺  4+n≥7.5  ⟺  n≥3.5.\frac{12(4+n)}{10}\ge 9 \iff 4+n\ge 7.5 \iff n\ge 3.5 .

The bound is sharp. With n=3n=3 the farmers till only 8.4<98.4<9 plots, while with n=4n=4 they till 9.6≥99.6\ge 9 plots. The minimum is therefore

4 additional farmers\boxed{4 \text{ additional farmers}}